Back to RS Construction
PACKAGE DETAILS

Residential construction in Hubli

₹2,099 per sq ft

Measurements are taken slab-to-slab and building out-to-out.

Materials and finish allowances

CementUltraTech, JSW Cement and Dalmia.
Bricks and paintRed bricks and Asian Paints.
SteelJSW Steel, Jindal Steel and Kamdhenu Steel.
SandRiver sand for concrete and brickwork. Washed M-sand for flooring, bed and compound work. Compound wall construction is charged separately.
Electrical wire and switchesV-Guard, Polycab, GM and Legrand.
Plumbing and sanitaryAstral, Supreme, Finolex, Jal and Jaquar.
WindowsSIMTA Astrix uPVC, 2.5-track with mesh. Allowance ₹350 per sq ft.
Main door₹30,000 including frame and shutter. Shutter thickness 1¼ inches.
Pooja door₹20,000 including frame and shutter.
Internal doorsHonne frame with plywood-laminated shutter.
Tiles and granite2×4 flooring tiles at ₹50 per sq ft. Wall tiles ₹35, kitchen platform granite ₹100 and staircase granite ₹70. Units for these last three allowances await confirmation. Brochure brands: Simpolo and Somany.
HardwareFlush-door lock ₹800 per door. Main-door handle ₹1,000. Main-door lock allowance ₹1,000–₹1,500, brand pending confirmation.
Hall ceilingComplimentary hall POP false ceiling.
Plinth and water tank3 ft plinth height. One 1,000-litre overhead tank on the slab top.

Additional charges and owner responsibilities

Black soil
Additional ₹100 per sq ft.
Underground water tank and septic tank
Additional ₹20 per litre, if applicable.
External works
Compound wall, additional safety gates, front elevation and glass railing are charged separately.
Permissions and utilities
The owner pays for building and corporation permissions, municipal water and drainage connections, CC charges, temporary electricity and borewell.
Wallpaper and watchman
The owner arranges interior wallpaper design and installation and bears watchman charges during construction.
Work beyond the agreed scope
Charged separately and payable by the owner immediately upon completion of that additional work.

Payment schedule

  1. 25% before commencement of the project.
  2. 20% after plinth level.
  3. 25% before slab level.
  4. 15% before tiling, external plastering and plumbing work.
  5. 10% before painting and installation of windows and doors.
  6. 5% after completion of all works and before key handover.
Get a Construction Quote