Residential construction in Hubli
₹2,099 per sq ft
Measurements are taken slab-to-slab and building out-to-out.
Materials and finish allowances
| Cement | UltraTech, JSW Cement and Dalmia. |
|---|---|
| Bricks and paint | Red bricks and Asian Paints. |
| Steel | JSW Steel, Jindal Steel and Kamdhenu Steel. |
| Sand | River sand for concrete and brickwork. Washed M-sand for flooring, bed and compound work. Compound wall construction is charged separately. |
| Electrical wire and switches | V-Guard, Polycab, GM and Legrand. |
| Plumbing and sanitary | Astral, Supreme, Finolex, Jal and Jaquar. |
| Windows | SIMTA Astrix uPVC, 2.5-track with mesh. Allowance ₹350 per sq ft. |
| Main door | ₹30,000 including frame and shutter. Shutter thickness 1¼ inches. |
| Pooja door | ₹20,000 including frame and shutter. |
| Internal doors | Honne frame with plywood-laminated shutter. |
| Tiles and granite | 2×4 flooring tiles at ₹50 per sq ft. Wall tiles ₹35, kitchen platform granite ₹100 and staircase granite ₹70. Units for these last three allowances await confirmation. Brochure brands: Simpolo and Somany. |
| Hardware | Flush-door lock ₹800 per door. Main-door handle ₹1,000. Main-door lock allowance ₹1,000–₹1,500, brand pending confirmation. |
| Hall ceiling | Complimentary hall POP false ceiling. |
| Plinth and water tank | 3 ft plinth height. One 1,000-litre overhead tank on the slab top. |
Additional charges and owner responsibilities
- Black soil
- Additional ₹100 per sq ft.
- Underground water tank and septic tank
- Additional ₹20 per litre, if applicable.
- External works
- Compound wall, additional safety gates, front elevation and glass railing are charged separately.
- Permissions and utilities
- The owner pays for building and corporation permissions, municipal water and drainage connections, CC charges, temporary electricity and borewell.
- Wallpaper and watchman
- The owner arranges interior wallpaper design and installation and bears watchman charges during construction.
- Work beyond the agreed scope
- Charged separately and payable by the owner immediately upon completion of that additional work.
Payment schedule
- 25% before commencement of the project.
- 20% after plinth level.
- 25% before slab level.
- 15% before tiling, external plastering and plumbing work.
- 10% before painting and installation of windows and doors.
- 5% after completion of all works and before key handover.